The Arabian Gulf Oil Company (AGOCO) has announced a project (MTC 15\2013) for the refurbishment of diesel oil tanks at CPS at Nafoora Oil Field.
BRIEF PROJECT DESCRIPTION:
It is required to refurbishment the diesel oil tanks (DB, DC & DO) & supply and construct new tank in the same place of tank (DA) at C.P.S. at Nafoora Oil Field. Contractor shall be supply all material and consumable material required for completion the project. Al specification, standards, detail scope of work were mention in bid documents.
All specialized companies which have the true desire to participate in this tender ,and have the efficiency ,ability, previous experience and specialized in the above mentioned field , be notified that tender documents shall be withdrawn during the period from :
Day: Tuesday Corres.To: 21\05/2013 A.D To: Day: Thursday Corres. To: 23/05\2013 A.D, from 12.00 p.m to: 14.00 p.m through a direct delivery to their representatives who have to fill the attached receipt form to be brought later on the date of delivery, in order to ease and speed the procedure to draw the tender booklet from the Main Tender Committee- office No. (4)-New building at the AGOCO headquarter- Alkies- Benghazi, upon an amount of money about (1000) working Libyan banks, for the benefit of the Arabian Gulf Oil company.
However, the booklet is allowed to be drawn only by bidders capable of providing the documents requested according to the following terms:
The representative shall be authorized to draw the tender booklet upon an official document, issued by the body he represents.