Well Design:
- 20 Conductor pre-set
- 17 ½” hole – 13 3/8” casing to 3300 feet
- 12 ¼” hole – 9 5/8” casing to 7600 feet
- 8 ½” hole – 7” Liner 11,000 to 7400 feet
- 1000 feet of 3 ½” EUE Kill string run in hole prior to rig release
Main Components:
- 1500 HP is most preferable 2000HP is also accepted , SCR powered, fast moving, depth rating to 15,000 feet Drilling Rig
- The rig must be in Libya
- 750,000 minimum Derrick rating with 500,000 lbs hook load capacity
- 500,000 lbs set back
- Top Drive, minimum 1000 HP
- 2 x 1500 HP Mud pumps
- 1800 – 2400 bbls Mud System
- 1200 - 1600 bbls water storage
- High speed Shale shakers, desander and desilter
- Connections for centrifuge tie-ins
- Adequate electrical power for 3rd party centrifuge contractor
- 5000 psi BOP and related equipment
- 12,000 feet 5” Grade G or 105 drill pipe
- 9 ½” Drill collars (6)
- 8” Drill collars (24)
- 6 ½” Drill collars (30)
- 4 ¾” Drill collars (24)
- 5,000 feet 3 ½” Grade G or 105 Drill pipe
- 80 – 100 man master-skidded camp
- Wellsite Office for Company Supervisor
- Wellsite Office/Lab for Geologist
- Wellsite office for Company Safety/Operations Supervisor
- Wellsite Sleepers for Supervisors (2), Geologist (2), Safety/Operations Supervisor (2)